Living Atlas / project dossier
Codename: Magadi Road
Costs, daily life, future evidence and your decision — in order.
Money
Enter your figures to calculate. No rate or income is assumed.
Enter all values to see an outcome. No growth assumption is prefilled.
Illustrative. Not a forecast or assured return.
Resale score: 47/100 · Risk and exit depend on verified market liquidity.
Handover stage: see Overview. Employment depth: see Location.
Potential resale alternatives are mapped nearby; check actual transactions before relying on any exit estimate.
Overview
This pin is approximate; the site may be nearby, not exactly here. · 12.97590, 77.55551
Google Maps: https://www.google.com/maps/search/?api=1&query=12.975898,77.555506
Codename: Magadi Road
Magadi Road, West Bengaluru
Buyers who can verify local amenities in person
You need a confirmed cost sheet before deciding
Developer: Krishna Group
Configurations: 3 BHK; 4 BHK
Handover: Announced
Krishna Group
RERA: Not published yet
Other Atlas projects: Krishna Shelton, Codename Shettigere
Location
Select a landmark below to open its mapped position.
Open project pin in Google Maps ↗1.1 km · straight-line · Status not published · OpenStreetMap node 5760197785 · "Sri Balagangadharanatha Swamiji Stn., Hosahalli", Chord Road · Date not published ↗
Balagangadharanatha Swamiji Station (Hosahalli) · Purple Line1.1 km · straight-line · Operational · OpenStreetMap node/6400857561 (via Photon geocoder) · Date not published ↗
Metro Cash & Carry Magadi Road1.4 km · straight-line · Status not published · OpenStreetMap node 5848373887 · "Metro Cash and Carry", Tank Bund Road · Date not published ↗
Suguna Hospital Rajajinagar1.5 km · straight-line · Status not published · OpenStreetMap way/1141353122 (via Photon geocoder) · Date not published ↗
ESI Hospital Rajajinagar1.7 km · straight-line · Status not published · OpenStreetMap node/2398081626 (via Photon geocoder) · Date not published ↗
Kempegowda Bus Station (Majestic)1.8 km · straight-line · Status not published · OpenStreetMap way 239832511 · "Kempegowda Bus Station", 4th Cross Road · Date not published ↗
Orion Mall Rajajinagar3.9 km · straight-line · Status not published · OpenStreetMap way 180837206 · "Orion Mall", Dr. Rajkumar Road · Date not published ↗
World Trade Center Bengaluru4.0 km · straight-line · Status not published · OpenStreetMap way/149418884 (via Photon geocoder) · Date not published ↗
Kendriya Vidyalaya Malleswaram4.0 km · straight-line · Status not published · OpenStreetMap way/38832006 (via Photon geocoder) · Date not published ↗
ISKCON Temple Rajajinagar4.0 km · straight-line · Status not published · OpenStreetMap node 7291611563 · "ISKCON Temple", Chord Road · Date not published ↗
Nayandahalli Junction4.5 km · straight-line · Status not published · OpenStreetMap node/699684262 (via Photon geocoder) · Date not published ↗
Kanteerava Studios5.4 km · straight-line · Status not published · OpenStreetMap way 47883772 · "Kanteerava Studio", Dr. Puneeth Rajkumar Ward · Date not published ↗
Sunkadakatte Metro Depot (planned · Phase 3)5.7 km · straight-line · Announced · The Hindu, 13 Jan 2026 (BMRCL Phase 3 tenders) · Date not published ↗
Gopalan Arcade Mall6.1 km · straight-line · Status not published · OpenStreetMap way/134100146 (via Photon geocoder) · Date not published ↗
Kidwai Memorial Institute of Oncology6.4 km · straight-line · Status not published · OpenStreetMap way/239738408 (via Photon geocoder) · Date not published ↗
Peenya Industrial Area7.1 km · straight-line · Status not published · OpenStreetMap relation 17570284 · "Peenya Industrial Area", Shivapura · Date not published ↗
Location, connectivity and lifestyle are reflected in the Living score. See the mapped evidence above.
Growth
Codename Magadi Road — west Bengaluru's next metro
Magadi Road gets a brand-new metro line and a 10.7 km arterial road. Each point links to its source.
The Union Cabinet approved the Hosahalli–Kadabagere metro line (about 12.5 km, 9 stations) as part of Phase 3, ₹15,611 crore.
PMO India · 16 Aug 2024
Stations: Hosahalli, KHB Colony, Kamakshipalya, Sumanahalli Cross, Sunkadakatte, Herohalli, Byadarahalli, Kamath Layout, Kadabagere.
News18 · 16 Dec 2025
Foundation stone laid 10 Aug 2025; completion target May 2031.
Note: Tender stage; construction not started.
The Hindu · 4 Nov 2025
10.76 km Mysuru Road–Magadi Road arterial road (300–320 ft wide, about ₹631 crore) is near completion.
Construction World · 29 May 2026
Phase 3's other line (JP Nagar–Kempapura) is planned to serve Peenya Industrial Area and BEL.
Note: Approved; not built.
PMO India · 16 Aug 2024
ANAROCK tracks Magadi Road with Mysore Road as west Bengaluru; Mysore Road averaged ₹7,350/sq ft in Q1 2025, up 2% that quarter.
Note: Neighbouring corridor, not Magadi Road itself.
ANAROCK Q1 2025 · Q1 2025
Not yet confirmed
- Exact site of the project is not confirmed, so no distances are given.
Qualified future amenities
Only projects with an approved DPR, an awarded contract or works already under way. Checked 6 Oct 2026.
DPR approved / sanctioned · Metro
Approved by the Centre in Aug 2024; foundation stone Aug 2025. Civil tenders are being recalled for re-tendering after a design change (Sep 2026); no work order yet
Phase 3 estimated at ₹15,611 crore (both corridors)
Site: 12.5 km along Magadi Road; Package 3 includes Sunkadakatte station and the Sunkadakatte depot
Map pin: Sunkadakatte Metro Depot (planned · Phase 3)
Brings metro access along Magadi Road, which has no metro west of Hosahalli today.
Sanctioned but construction has not started; timelines may move with re-tendering.
The Hindu, 13 Jan 2026; Metro Rail News, 17 Sep 2026 ↗Works under way · Road
Final stage; BDA preparing to open; 321.21 acres acquired
About ₹631 crore (revised from ₹465 crore)
Site: Challaghatta (Mysuru Road) to Kadabagere Cross (Magadi Road) through NPKL
A signal-free route between south and west Bengaluru, near NICE Road.
Linear road; not shown as a single pin.
Construction World, 29 May 2026 ↗0 operational / under construction · 2 announced / proposed
proposed
Metro · Jun 2026 · proposed
Two corridors totalling about 44.65 km moved toward final Central approval on 11 June 2026 after a RITES re-validation put the economic return at 15.9%.
Source ↗Market · Jul 2026 · proposed
The state has outlined an expansion to nearly 500 km through the Pink Line, Blue Line, Phase 3 and future corridors.
Source ↗Compare & decide
Your alternatives
10 projects to consider
Same home type first · source-linked catalog suggestions. Wider-area options are not necessarily local rivals.
Competition
0 mapped rivals within 5 km
0 source-linked · 0 to verify · your pin is locality-level, distances approximate
Price position: no ₹/sqft is published for 0 of 0 rivals yet, so the price scale stays hidden until rates are sourced.
No verified local rival positions inside this radius yet. Catalog alternatives above remain available; no nearby rivalry is implied.
Awaiting RERA/builder verification (not mapped): Launches in Vijayanagar, Rajajinagar, Magadi Road, Basaveshwaranagar, Mysore Road.
Distances are straight-line km. Home type: apartment. No price, RERA or possession figure is guessed.
| Measure | Codename: Magadi Road |
|---|---|
| Price / rate | Rate on request |
| Unit sizes | On request |
| Approvals | On request |
| Handover | Announced |
| Living | 63 |
| Growth | 55 |
| Rental | 63 |
| Resale | 47 |
| Rent range | On request |
| Developer | Krishna Group |
Nearby alternatives · listing data
30.4 acres, 526 plots · RERA not applicable per listing · Housing.com listing · 2025 · Listing, unverified
· DTCP 11/2017 · NoBroker blog, Jun 2026 · 2026 · Listing, unverified
80 acres, 1,224 plots · HNTDA 88/2018 · NBR Group website · Date not published · Listing, unverified
about 77 acres · · JLL Homes listing · 2026 · Listing, unverified
78 villas · TNRERA/13613/2022 · Housing.com listing · 2026 · Listing, unverified
62 acres, 800 plots · · Housing.com listing · 2026 · Listing, unverified
35 acres, 759 plots · DTCP and HNTDA approved per listing · Housing.com listing · 2026 · Listing, unverified
Decision checklist
Where exactly is this?
On the Magadi Road corridor in west Bengaluru, close to the Purple Line — a central-west address rather than a peripheral one, which is the key difference from the airport or Sarjapur launches.
What is the expected pricing?
The launch rate card is with the sales desk. West Bengaluru is priced below the east and north corridors today, which is the entry-point argument here — put the quoted rate into the calculator in Pricing for a per-unit figure.
Confirm with sales before quoting
How is the connectivity?
Purple Line metro on Magadi Road already links this belt to Majestic and the CBD, and Metro Phase 3 along the west ORR is set to add the missing north-south link. See the Growth story for sources.
Is west Bengaluru a good bet?
It is the value corridor: established residential fabric, working metro today and Phase 3 coming, at rates well under the eastern corridors. The trade-off is fewer new-economy offices nearby than Whitefield or Electronic City.
When is possession?
It is an announced project — get the RERA-declared completion date in writing before booking.
Confirm with sales before quoting
What is the all-inclusive cost, not just the per-sqft rate?
Base rate x saleable area is only the start. On top of it a buyer pays floor rise / preferred-location charges where applicable, car park, club membership, infrastructure and maintenance deposit, GST (5% on under-construction, nil on ready homes with an Occupancy Certificate), stamp duty and registration (about 5% + 1% in Karnataka), and legal/documentation. Budget roughly 10-15% above the base value for an under-construction home.
Is the project RERA registered, and what is the number?
Ask for the K-RERA (or TN-RERA for Hosur) registration number and check it yourself on the state RERA portal — it shows approved plans, promised completion date and quarterly progress. Never pay a token on a project whose number you have not seen.
Confirm with sales before quoting
What is the Khata type — A Khata or B Khata?
A Khata means the property is fully compliant with the local body and is straightforward for home loans and resale. B Khata restricts loan options and resale value. Insist on seeing the Khata certificate and extract before booking.
Confirm with sales before quoting
Which banks have approved the project (APF)?
A project with APF approval from major lenders (SBI, HDFC, ICICI, LIC HFL, Bajaj) has already been through their legal and technical due diligence — that is an independent check on the title. Ask for the APF list.
Confirm with sales before quoting
What are the maintenance charges and the corpus deposit?
Typically quoted in ₹ per sqft per month, plus a one-time corpus/sinking fund. Ask what it covers (security, generator backup, clubhouse, STP, lifts, landscaping) and for how many months it is collected upfront.
Confirm with sales before quoting
Is there an Occupancy Certificate / Completion Certificate?
For a ready home the OC is non-negotiable — without it the building is legally not fit for occupation, GST treatment changes and resale gets difficult. For an under-construction home, ask when the OC is expected.
Confirm with sales before quoting
What is the carpet area versus the saleable area?
RERA requires carpet area to be stated. Loading (the difference between saleable and carpet) is usually 25-33% in Bengaluru. Compare projects on carpet area, not on the headline rate.
What is the payment schedule?
Usually a booking amount, then agreement within 15-30 days, then construction-linked instalments; ready homes are largely down-payment. Ask for the written schedule and the cancellation/refund clause before paying anything.
Confirm with sales before quoting
What is the penalty if possession is delayed?
RERA entitles you to interest on delay. Check the exact rate and the grace period written into the agreement — some agreements give the builder a 6-12 month grace window.
Confirm with sales before quoting
Where does the water come from, and is there power backup?
Ask whether it is Cauvery/BWSSB supply, borewell, or tanker-dependent, and what the STP/rainwater harvesting setup is. Also confirm DG backup — how many KVA per flat and whether common areas are fully backed up.
Confirm with sales before quoting
How many car parks are included, and is a second one available?
One covered park is usually included with 2 and 3 BHK. A second park, if available, is charged separately. Confirm covered vs open and whether an EV charging point can be provided.
Confirm with sales before quoting
What is the rental yield and resale demand here?
Bengaluru gross yields typically run 3-4% and depend far more on the employment catchment than on the building itself. Use the catchment scores and jobs metrics in this card as the honest answer, and quote actual rentals for comparable units in the same micro-market.
What is the builder's track record?
Ask for the list of completed projects with delivery dates, and check the promoter's history on the RERA portal for complaints. Visiting one delivered project tells a buyer more than any brochure.